University of Roehampton Harvey Building

VolkerFitzpatrick recently completed the extension and remodelling of a former university library building into flexible teaching space for the Department of Media, Culture and Language.

  • Two-stage D&B project
  • New facilities cover 43,000 ft2 on three floors
  • 147 individual rooms providing TV, film, photography and sound production studios, editing suites and a 90-seat cinema/lecture space
  • Courtyard was covered with a new glazed roof supported on bespoke laminated ply beams creating a new exhibition and social space
  • Full Cat A and B fit out.
  • Required careful logistics planning with the live university and continuous liaison during construction.
  • Negotiated the following phase of works for the £4.3m Sir David Bell Media Centre due to the excellent relationship developed with our positive, collaborative approach.

Facts and figures

  • Client
    University of Roehampton
  • Project Value
    £8.5m
  • Programme
    48 weeks
  • Project categories
    Building
+